Blog Entry# 4483088
Posted: Nov 09 2019 (17:03)
No Responses Yet
The two SGUJ/NGC WDG-4D locos powering the train since BPB along with the SGUJ/NGC WDG-4D loco attached at the rear of the train at BPB are detached here. The loco which was powering the train from SCL to BPB now powers the train till GHY.