The extension of 16023 malgudi express till yelhanka is the reason behind this. To decongest at Yesvantpur, this step has been taken. Solution for all this problem is, malgudi express should get cancel from YNK to YPR and it should get the older time table. Leaving ypr at 1.15, reaching sbc at 1.25 n departing sbc at 1.30 or 1.35. Siddhaganga express should leave at 1 from pf-9, then this malgudi can get in to pf-9 at 1.25, and further tippu express 12613 can enter pf-9 by 1.45 or 1.50. Else malgudi express should be diverted by cantonment. Anyhow, proper maintenance can solve all the problems. Care should be taken.