Yes track laying has already started between ynk to dbu. The bridge near makalidurga may complete by 3 months. Wiring is in full swing between mkl to deverapalli. Foundation for poles for second line have been laid between devarapalli to pkd. As it was dark i couldnt capture the pictures.