Given that the NCJ TVC Section will also be FEDL, the entire TVC MS section will be FEDL and a Duronto from TVC to NZM is easily possible in the future. With an average of 71 kmph, which is lower than Chennai Duronto, which does 77 kmph, this would be the fastest train from TVC to NZM covering the distance in 42 hours. This is faster than TVC raj by 4 hours. Also no trains reach NZM in the morning hours from TVC (5 - 9 AM). Given all these factors, this train would defenitely be a hit. Please flag and comment