Royapuram 3rd Terminal should be built with 10 0r 12 platform to accommodate 24 coaches.Terminal entry and exist should be provided on the both Southern and Northern side.
Other PIT LINE WORKS and Electric/Diesel Engine shed,other traffic facilities etc should be arranged in the nearby Korukkupet/Tondaiyarpet Yard areas so as this TERMINAL accommodate more trains and feature expansion.