ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ:રાજસ્થાનના ડુંગરપુરથી હિંમતનગર સુધી NWRની OHE કારમાં PCEE ઈલેક્ટ્રીફીકેશનની કામગીરીનું નિરીક્ષણ કરાયુંThe electrification work on the railway line between Ahmedabad and Udaipur is progressing well. The work from Asarva to Himmatnagar has been completed and trials have been conducted. Currently, cabling is being done between Himmatnagar railway station and the outer point. The electrification work from Udaipur to Shamlaji is complete and...
more... charged, while 80% of the cabling work between Shamlaji and Himmatnagar has been completed. The Principal Chief Electrical Engineer (PCEE) of the North Western Railway (NWR) inspected the ongoing electrification work from Dungarpur in Rajasthan on Saturday. After inspecting the work between Shamlaji and Himmatnagar, the PCEE reached Himmatnagar railway station in the evening. The electrification work is expected to be completed within the next two months.
Ahmedabad se Udaipur railway line pe electrification ka kaam aage badh raha hai. Asarva se Himmatnagar tak ka kaam pura ho gaya hai aur trials bhi ho gaye hai. Abhi Himmatnagar railway station se outer point tak cabling ka kaam chal raha hai. Udaipur se Shamlaji tak electrification ka kaam pura...
more... ho gaya hai aur charge bhi kar diya gaya hai. Shamlaji se Himmatnagar tak 80% cabling ka kaam pura ho gaya hai. Railway crossing ke aas paas kaam baaki hai. Aage aane wale do mahino mein Asarva se Udaipur tak electrification ka kaam pura ho jaane ki sambhavna hai.