From where Somanko Supremacy?? I Sent TT proposal which was HWH 5.55 hrs; 146.5 BHP 7.50/52; 207 RPH 8.40(pass); 259.7 PKU 9.24(pass); 296.9 NFK 9.55(pass); 332 MLDT 10.25/30; 479.7 KNE 12.22/24; 567 NJP 13.30| In return 22302 NJP-HWH VB will dep NJP at 14.30; KNE 15.36/38; MLDT 17.30/35; NFK 18.05(pass); PKU 18.36(pass); RPH 19.20(pass); BHP 20.08/10; HWH 22.05| 567 kms in 7 hrs 35 mins @ 75 kph. Actual TT made:- HWH 05.50; MLDT 10.45/50; NJP 13.50| NJP 14.50; MLDT 17.55/18.00; HWH 22.50| Up taking 295 mins in HWH - MLDT section of 332 kms @ 67.53 kph(+25 mins more than my proposal) Down taking 290 mins in MLDT-HWH section 332 kms @ 68.69 kph(+20 mins more than my proposal). Looking at the actual TT, it's just reverse 12041/42. Train number proposed by me is 22301/22302. Lets see on that. My proposal has matched for the most part, just timing...
more... is very slow in HWH-MDLT-HWH part as per VB Express standard.