HWH-PRRLal Mati was proposed ti run upto CKP after locadown instead of PRR, it was rejected by DRM/CKP. Moreover timing of this imaginary train is not good, there is demand for afternoon trains between ROU-TATA and TATA-ROU as there is huge gap between Ispat and Gitanjali in Up direction and ADI-HWH and Ispat in Down direction.