it should run we have to demand. but don't know where to demand as AP MPS are behind land grabbing's and ECoR and IR never care for regular trains from AP and even given a train it take hell of time to sanction and suffer with slow TTs. As this is one ways special this was escaped as no one cares and i am sure may be this arrived both ways minimum 4-5 hrs delay.