ER must ply Trains in HWH-NJP stretch with E-Locos atleast uptill MLDT.
Also re-modify TT of 13011/12. Abstract TT given below
13011:- HWH 15.25; 39.6 BDC 16.10/12; 107.1 BWN 17.25/27;
140.4 GKH 18.03/04; 159.3 BHP 18.25/27; 178.5 AMP 18.45/46;
191.8...
more... SNT 19.00/01; 219.3 RPH 19.31/36; 233.3 NHT 19.51/52;
272.3 PKR 20.35/37; 308.9 NFK 21.18/20; 344.0 MLDT 22.05 |
13012:- MLDT 04.30; 35.1 NFK 05.06/08; 71.7 PKR 05.49/51;
110.7 NHT 06.33/34; 124.7 RPH 06.50/55; 152.2 SNT 07.25/26;
165.5 AMP 07.40/41; 184.7 BHP 08.05/07; 203.6 GKH 08.28/29;
236.9 BWN 09.06/08: 304.4 BDC 10.23/25; 344.0 HWH 11.10.
--------------------------------------------------------------------------------------------------------------
344 kms | 6 hrs 40 mins | 52 kph | M/E | ER |
Speed up:- 13011 by 55 mins & 13012 by 35 mins.
Current TT:-
13011:- 7 hrs 35 mins @ 45 kph | 13012:- 7 hrs 15 mins @ 47 kph.