Check the TT for some corrections
Need Loco Reversal at
1.Bidar
2.Parli
3.Akola jn
Need...
more... LR time to be atleast 15-20min as 10min is not possible as provided at GR.
Some stations have 5min halt and some have 2 and 1 min halt so check for proper halt times at each station as per Regular trains on those stations.
Conclusion: Route will be Long with lot of Loco reversals so does it feasible to run train in this routing?