HWH-BZA could may be an exception as I have never travelled in that. Actually It's enough even if Rly. manages to ensure 1/2 the capacity filled for profit. And I think BZA HS should be extended to SC. Instead of introducing Humsafars , some more 3A could have been added in existing superfasts or started new superfast with 5 or more 3AC coaches.
View this blog and its subsequent replies:
/blog/post/3203731