Yes there is a handshaking agreement between DHN & DNR but not like DHN & HWH for BD/CF.
DNR does ocassional PM if there is a delayed arrival/departures.
And the coach length can't be more than 18-19 because pitlines 1 and 3 is limited by the length of 22 ICF coaches.