Scrubbing and cleaning. It was a new rake and too be honest, I have no idea what was going on, but there were people all over the rake, busy inspecting.
It was parked in the pitline numbered 3 so the rake couldn't been more than around say 19-20 coaches long.
And Rajeev sir, pitlines are the same for all trains. It is the crew that requires training.