They should run all trains on Electric Loco through out the journey without detaching at Gulbarga/Daund. They just need add extra diesel engine from Gulbarga by keeping electric engine idle and detaching that diesel at Daund, then the same electric loco should be continued it's journey. So the diesel will rotate between Pune/Daund to Gulbarga only.