Yes. It can be extended to HPT with a 7 hour schedule from SBC with arrival at HPT at around 1 PM and 12692's departure can be at around 2:30 PM. Atleast the train will run without generating losses. At present, it is hit between MAS and SBC. Runs jampacked both the ways. But eitherway, it runs empty between SBC and SSPN. Even the general coaches are empty in the SSPN-SBC stretch. IR should consider some extension or terminate it at SBC itself. Or even MYS/HAS(via KIGL) extension can be considered.