Somehow I dont like this jugaad measure of using 2 wap5 and forced priority to reduce travel time. Yaar badana h speed toh dhang se badhao, NDLS KOTA aur BRC-ST 160 fit kar do. I sincerely hope it is a failure so that IR stop using this kind of backhand measures at cost of other trains