Is this train getting E-Loco end to end? On 25th, along with other inaugurals, the section of GTL-WADI was to be commissioned open for E-Locos and this would have been one of the first train to get E-Locos end to end. But since that function was postponed, when would this train get E-Loco from GTL-HYB?