Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sun Jun 30 01:48:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

07761X/Visakhapatnam - Tirupati Double Decker Special
विशाखापत्तनम - तिरुपति डबल डेकर विशेष

VSKP/Visakhapatnam Junction --> TPTY/Tirupati

Latest News
(You need to double-check/verify this info yourself)
News History
0 Follows
Bedroll/Linen: Don't know change
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
TRAIN IS CANCELLED
Dep:
Arr:
RSA - Rake Sharing
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 C9
  3
 C8
  4
 C7
  5
 C6
  6
 C5
  7
 C4
  8
 C3
  9
 C2
 10
 C1
 11
EOG
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    12 blog entries  <<prev  next>>
Rail Fanning
15621 views
20

★★★
Aug 16 2016 (12:43)   07761X/Visakhapatnam - Tirupati Double Decker Special | KVR/Kovvur (3 PFs) | BZA/WAG-7/28251
 
M V S Murthy~
M V S Murthy~   11643 blog posts
Entry# 1964228            Tags   Past Edits
BZA WAG7 28251 curves into KVR with 2hrs late running 07761 Visakhapatnam Jn - Tirupati DD Pushkaram Special.
Translate to English
Translate to Hindi

15 Posts

9509 views
0

Aug 16 2016 (13:36)
Abhishek Dubey   16640 blog posts
Re# 1964228-16              
@1964228-15  @guest
Okzz
Now doubt clear wse mere mobile me itna zoom nhi ho rhi thi ki distinctly dkh sku
Shukriya
Translate to English
Translate to Hindi

9554 views
0

Aug 16 2016 (13:36)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1964228-17              
@1964228-9  @guest
1 EOG is enough for 9 coaches. Even in most Shatabdi's and DD's, only the rear EOG is usually active.
Translate to English
Translate to Hindi

11850 views
2

Aug 16 2016 (13:39)
SHIVAM SINGH~   343 blog posts
Re# 1964228-18              
yes there is front eog . see carefully at loco roof u will be able to see a light yellow curve . thats the eog's roof
Translate to English
Translate to Hindi

9892 views
1

Aug 16 2016 (13:45)guest
Re# 1964228-19              
nopes...if they use single eog then there will be overload on that eog ...even 11 coach shatabdi used to have both eog running,, i dont know exact rating of one eog ibut iam sure it is not enough to power 9 double decker coaches.
see this video both eog are on...
click here
Translate to English
Translate to Hindi

9476 views
1

Aug 16 2016 (14:29)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1964228-20              
@1964228-19  @guest
You can also see quite a few videos where only one EOG is on. I've personally seen SBC-MAS DD, MAS-SBC shatabdi and MAS-MYS shatabdi many times running with a single EOG on. And no, they won't overload the EOG. Many reasonably long, full AC trains line 12775/76 ( 14 coach AC rake) usually run with single EOG on.
The newer EOG coaches have a 750KVA diesel generator installed, that is usually sufficient for 15-18AC coaches, but with a peak efficiency between 9-12 coaches ( These are again dependent on the occupancy, outside temperature and some other factors). But 9 coaches are easily manageable for an LHB EOG car.
Translate to English
Translate to Hindi
Info Update
38648 views
2

Aug 15 2016 (02:04)   07761X/Visakhapatnam - Tirupati Double Decker Special | VSKP/Visakhapatnam Junction (8 PFs)
 
Vaibhav Agarwal
Vaibhav Agarwal   6716 blog posts
Entry# 1962979            Tags   Past Edits
Double Decker Trains for Krishna Pushkaram
Translate to English
Translate to Hindi

16305 views
0

Aug 15 2016 (10:44)
~   1665 blog posts
Re# 1962979-1              
nice.... but timings to be improved for regular runs !
Translate to English
Translate to Hindi

15618 views
0

Aug 15 2016 (10:53)
guest   40346 blog posts
Re# 1962979-2              
still under proposal vskp-bza or vskp tpty if reg tt will be good as this spl has rsa so tt is deisgned as per krishna pushkaram requirements
Translate to English
Translate to Hindi
General Travel
11227 views
1

Aug 13 2016 (12:46)   07761X/Visakhapatnam - Tirupati Double Decker Special | VSKP/Visakhapatnam Junction (8 PFs)
 
Pk12717~
Pk12717~   6779 blog posts
Entry# 1961377            Tags   Past Edits
Started it's first run...
Departed from VISAKHAPATNAM (VSKP) at 13-Aug 12:15 No Delay
Translate to English
Translate to Hindi

5 Posts

9002 views
1

Aug 13 2016 (13:00)
guest   40346 blog posts
Re# 1961377-6               Past Edits
reasons r many here if we take examples, iam not bothered about tkts avl here pr should be released before 5-7 days dep time ,here just 2-3 days for dep, extra 2-3 days required for this kind of trains min 5 days bookings opeing
Translate to English
Translate to Hindi

8764 views
1

Aug 13 2016 (14:19)
Pk12717~
Pk12717~   6779 blog posts
Re# 1961377-7              
Thrashed by Ratnachal and Prasanthi already at BVM...now DD will arrive BZA after 19:30 only...
Translate to English
Translate to Hindi

9013 views
0

Aug 13 2016 (18:24)
guest   40346 blog posts
Re# 1961377-8              
so tpty vskp ontime dep is doubt
Translate to English
Translate to Hindi

8848 views
1

Aug 13 2016 (20:32)
Pk12717~
Pk12717~   6779 blog posts
Re# 1961377-9              
Yet to reach BZA...
Translate to English
Translate to Hindi

8851 views
0

Aug 13 2016 (21:12)
guest   40346 blog posts
Re# 1961377-10              
reached successfully after 3hrs delay to bza, still mim normal tt bza-tpty via ngnt will take 6. 45hr appx add 1-2 hrs extra expecting 5am arrival, dep 6am tpty -vskp
Translate to English
Translate to Hindi
Trip
9195 views
0

Aug 14 2016 (15:55)   07762X/Tirupati - Vishakapatnam Double Decker Special
 
guest   73 blog posts
Entry# 1962600            Tags  
Please enjoy my Trip with me.
Posted thru RailCal
Translate to English
Translate to Hindi

16476 views
0

Aug 14 2016 (16:02)
guest   73 blog posts
Re# 1962600-1              
TRIP HAS ENDED.

Translate to English
Translate to Hindi
General Travel
18615 views
1

Aug 10 2016 (08:10)   07762X/Tirupati - Vishakapatnam Double Decker Special
 
Rajesh~
Rajesh~   2353 blog posts
Entry# 1957123            Tags  
SCR is giving very odd timings for DD and later saying very poor response. This can start TPTY after 6am
Translate to English
Translate to Hindi

60 Posts

9472 views
0

Aug 11 2016 (14:38)
_LaplandExp~   1877 blog posts
Re# 1957123-61              
well why dont you look at the way GDR handles the trains then buddy...then you will have a clear idea ....the trains which is coming towards GDR will always gets late even thought they start/reach destinations on time....and to cover that delay...they give slack between NLR-GDR both directions...and there is no such route constraints or speed restrictions in GDR sections as much as in the BZA-DVD which is the reason why trains will ply with significantly low Speed then that of GDR section...
.
and more over its not just passenger traffic but
...
more...
also the goods traffic has to be maintained without delay as it may hit IR revenues ...so most of the times if you see, main lines are blocked in SCR and SCR is also famous for giving Trains to skips through PF/Loop side rather than through main line which always requires additional time as it has to slow down before switching and continue like that till the entire rake crosses the switch and joins the main line.....one thing i would like to say here..no matter what...you cant compare the BZA station with RJY because a junction handling the trains is altogether a new ball game compared to the way intermediate statoins managing the traffic and giving priorities no matter form where they are getting instructoins...

Translate to English
Translate to Hindi

9383 views
0

Aug 11 2016 (14:39)
_LaplandExp~   1877 blog posts
Re# 1957123-62              
did i said DVD is in SCR ? i said BZA-DVD section ...not DVD station
Translate to English
Translate to Hindi

9783 views
1

Aug 11 2016 (15:00)
Srikanth_BZA~
Srikanth_BZA~   2233 blog posts
Re# 1957123-63               Past Edits
RJY is built in such a way that no body can do anything. From KVR - Kadiyam speed restriction is there. If Freight is ahead of the train, then its always a problem, train will stop at KYM. Also, BZA - VSKP is busy with freights. I guess, Auto Signalling will clear this problem, then trains/freights might go back to back, not sure though whether its possible or not.
Translate to English
Translate to Hindi

11609 views
0

Aug 11 2016 (18:17)
hemachandra   31 blog posts
Re# 1957123-64              
The train should start at 6.00 pm at TIRUPATY and reach at 6.00 am at VSKP. In the reverse direction also the same timings. SUPER HIT ...SUPER HIT.
Translate to English
Translate to Hindi

9577 views
0

Aug 13 2016 (15:32)
yansrikanth   5 blog posts
Re# 1957123-65              
Krishna Pushkaralu Details here
click here
Translate to English
Translate to Hindi
Page#    12 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy