Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 25 17:16:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

COA/Kakinada Port (3 PFs)
Local Name: Cocanada
काकिनाड़ा पोर्ट
కాకినాడ పోర్ట్


Track: Double Electric-Line

Updated: Jan 26 2023 (07:01) by guest
Show ALL Trains
Tilak Street, Kondayya Palem, Kakinada, District - Kakinada. Pin - 533001.
State: Andhra Pradesh

Elevation: 4 m above sea level
Type: Terminus   Category: NSG-4
Zone: SCR/South Central   Division: Vijayawada


No Recent News for COA/Kakinada Port
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 7
Number of Terminating Trains: 7
0 Follows
Rating: 3.0/5 (45 votes)
cleanliness - good (6)
porters/escalators - average (5)
food - average (5)
transportation - average (6)
lodging - average (5)
railfanning - good (6)
sightseeing - good (6)
safety - average (6)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 300 blog entries  next>>
General Travel
3825 views
3

Yesterday (21:43)   COA/Kakinada Port (3 PFs)
PowerStar~
PowerStar~   2705 blog posts
Entry# 6074915            Tags   Past Edits
1 compliments
Useful
Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot

1. Two stabling lines with electrification works are final stage.

2.
...
more...
Electrification works going for all pitlines Future VB Sets

3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed.

4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length

5. Automatic Coach Washing unit installation works going on at Pitline No 3

Translate to English
Translate to Hindi
Poll
2608816 views
37 votes
2

Apr 26 2021 (18:30)   12727/Visakhapatnam - Hyderabad Godavari SF Express (PT) | VSKP/Visakhapatnam Junction (8 PFs)
 
SCoR~
SCoR~   1812 blog posts
Entry# 4948161            Tags   Past Edits
What should be the name of second Terminal (marripalem terminal) in Visakhapatnam/Vizag
Translate to English
Translate to Hindi
NO vote
Visakhapatnam City
27%
10
Visakhapatnam North
0%
0
Visakhapatnam East
0%
0
Visakhapatnam West
3%
1
Visakhapatnam South
0%
0
Visakhapatnam Central
5%
2
Visakhapatnam Terminus
3%
1
A leader name associated with AP/Vizag(PSRT-Potti Sri Ramulu Terminus Visakhapatnam;ASRT-Alluri Sitaramaraju Terminus Visakhapatnam;TVT-Tenniti Viswanatham Terminus Visakhapatnam; or any-please mention)
57%
21
Marripalem
3%
1
Any other (please mention)
3%
1

More Posts
General Travel
6502 views
0

May 23 (21:01)   CHZ/Charlapalli (5 PFs)
abdulrazzak123
abdulrazzak123   108 blog posts
Entry# 6074109            Tags   Past Edits
CHZ railway terminal works reached to its final stage inspection conducted GM Arun Jain
Translate to English
Translate to Hindi
General Travel
40263 views
11

May 21 (14:11)   12797/Venkatadri SF Express (PT) | KCG/Kacheguda (5 PFs)
abdulrazzak123
abdulrazzak123   108 blog posts
Entry# 6071759            Tags   Past Edits
2 compliments
Great Useful
49 𝐲𝐞𝐚𝐫𝐬 𝐬𝐩𝐥 𝐠𝐢𝐟𝐭 𝐟𝐫𝐨𝐦 𝐒𝐂𝐑 𝐭𝐨 𝐕𝐞𝐧𝐤𝐚𝐭𝐚𝐝𝐫𝐢 𝐒𝐅 𝐄𝐱𝐩
12797/98 are under suspension from "18𝐭𝐡 𝐒𝐞𝐩𝐭 2024" and expected to run with LHB Coaches
the prestigious train of SCR is finally to be LHB
Translate to English
Translate to Hindi

More Posts
General Travel
56693 views
5

May 19 (14:39)   12738/Gowthami SF Express (PT) | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   108 blog posts
Entry# 6069544            Tags   Past Edits
1 compliments
Useful
Train Length is expected to be increased to 23 Coaches as CSMT Platforms extensions is almost done
Reservation of 12738/12737 & 17057/58 are under suspension from 13th Sept 2024 in both the directions
RSA is expected
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 300 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy