Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 22 20:05:20 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5952408
Posted: Jan 25 (21:35)

No Responses Yet
Rail News
16505 views
0

New Facilities/Technology
NWR/North Western
Jan 25 (21:35)   Bhiwani City Railway Station Construction Resumes, Foot Overbridge and Circulating Area Underway

Exynos9611~   19807 news posts
Entry# 5952408         Tags   Past Edits
Bhiwani सिटी रेलवे स्टेशन पर 4.75 करोड़ की लागत से तैयार होंगे फुट ओवरब्रिज, अप्रैल से यात्रियों को मिलेगी सुविधा

The construction work at Bhiwani City Railway Station has resumed with a total cost of 4.75 crores. This includes the construction of a foot overbridge at a cost of 2.5 crores and a circulating area at a cost of 2.25 crores. The foot overbridge is expected to be completed by April...
more...
2024 and the circulating area by February 2024. The circulating area will have a 40,000 square feet area, a shed for passengers on the platform, and the toilets will be moved back from the platform. The construction of the foot overbridge is expected to enable the stoppage of almost all trains at the city station, allowing passengers to access all train services. Currently, the lack of a foot overbridge has prevented most trains from stopping at the station, causing inconvenience to passengers. The station also plans to issue tenders for the construction of a goods shed soon, which will include a shed and an access route. The Superintendent of the City Station, Sanjeev Kumar, confirmed the progress of the construction work.

Bhiwani City Railway Station pe kaam fir se shuru ho gaya hai. Isme 4.75 crore ka budget hai. Isme 2.5 crore se foot overbridge banaya ja raha hai aur 2.25 crore se circulating area banaya ja raha hai. Foot overbridge April 2024 tak aur circulating area February 2024 tak complete hone...
more...
ki umeed hai. Is circulating area me 40,000 square feet ka area hoga, platform pe passengers ke liye shed bhi hoga aur toilets ko platform se thoda peeche shift kiya ja raha hai. Foot overbridge banne ke baad almost sabhi trains Bhiwani City Station pe rukengi aur passengers sabhi trains ki services ka fayda le paayenge. Abhi tak foot overbridge na hone ki wajah se zyadatar trains station pe nahi rukti thi aur passengers ko dikkat hoti thi. Station pe jaldi hi maal godam ke liye bhi tenders jaari kiye jaayenge. Isme maal godam ki shed aur aane jaane ke liye raaste banne wale hain. Ye sab tenders process me hai aur jaldi hi jaari kiye jaayenge. City Station ke Superintendent, Sanjeev Kumar ne yeh confirm kiya hai ki construction work chal raha hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy