Track doubled and electrified in Mysore Bangalore section. However all trains take minimum 2-1/2 hours to 3 hours in the section, meaning average of around 50 kms speed. Add 15 minutes slack to get more punctuality.
Compare MAS KPD SA section. 340 kms in 4-4.5 hours by most of the trains.