Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Oct 19 01:30:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 364174
  
Oct 12 (15:13) Bengaluru Metro airport line to now run through Hebbal (www.newindianexpress.com)
Other News
BMRC/Bangalore Metro
0 Followers
1300 views

News Entry# 364174  Blog Entry# 3892170   
  Past Edits
Oct 12 2018 (15:13)
Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by 16591🔹Hampi Express🔹16592^~/36147
The Metro line proposed from Nagawara to Kempegowda International Airport (KIA) is likely to be realigned to run through Hebbal. The realignment is being considered by the state as well as Bangalore Metro Rail Corporation Limited (BMRCL) due to the presence of a high-pressure Bengaluru-Mangaluru petroleum pipeline passing through the originally proposed route, thereby ruling out any construction activity in its vicinity, said highly placed sources.
As per the original Detailed Project Report of the Phase-2B Metro line, the 29.62-km line was to begin at Nagawara, head to RK Hedge Nagar via Thanisandra Main Road. It was to then turn left to Jakkur Flying School and take the Ballari Main Road to terminate at the airport. The Rs 5,950-crore line was approved
...
more...
by the state cabinet on December 11, 2017, and was slated have six stations — R K Hegde Nagar, Jakkur, Yelahanka (Kogilu Cross) and Chikkajala apart from two stations inside KIA. The 21.25-km Gottigere-Nagawara line (red line), which has the longest underground corridor of Phase-II, will connect with the airport line when ready. 
“The new proposal suggests taking the line directly from Nagawara station via Outer Ring Road to Hebbal and then taking Ballari Main Road right up to Jakkur Flying School. From there, the alignment will remain the same as the original plan,” said a source. 
Explaining the reasons for the sudden change in alignment long after it had been approved, a source said, “There are practical problems. The presence of the high-pressure petroleum pipeline which passes between Hegde Nagar and the flying school has forced this rethink. Due to safety regulations, no construction can come up for up to 9 metres on either side of the pipeline.”
There is a major water pipeline too which is in the way, but some kind of arrangement can be worked out for that. “The petroleum pipeline cannot be touched,” the source explained. If the proposal is approved by the Cabinet, then a Metro station will come up at Hebbal instead of RK Hegde Nagar.
Pressed for details on the revised cost or length of the Metro line, an official said, “The distance will be almost the same. We are still working out other details. It will be made public by the government when it is all completed.”As per both the old and new plan, the Metro line will mostly be elevated barring a small section near the Yelahanka air force station where it will run at ground level and then continue as an elevated line.
Taking a different route
■ No construction can be taken up on either side of high-pressure petroleum pipeline running through original Metro route
■ Metro station will come up at Hebbal instead of R K Hegde Nagar
■ Distance to airport will be almost the same as originally planned

  
278 views
Oct 13 (12:28)
VTU is one of worst uinversities in Indi^~   1850 blog posts   1092 correct pred (67% accurate)
Re# 3892170-1            Tags   Past Edits
Instead of doing such drama just provide a halt near the trumpet interchange on YNK-KOLAR line instead of simply wasting tax payers money.Its a win-win situation for both the government and to the commuters
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy