Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode
 
Thu Mar 28 14:33:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4203419
Posted: Jan 21 2019 (16:53)

2 Responses
Last Response: Jan 21 2019 (21:58)
General Travel
11588 views
2

Jan 21 2019 (16:53)   12368/Vikramshila Express (PT) | JMP/Jamalpur Junction (4 PFs)
Railadventures~
Railadventures~   2770 blog posts
Entry# 4203419            Tags   Past Edits
Bhagalpur Jn Cleanliness, Electrification and doubling updates, Do like this video and subscribe my channel.
Also check my tweet:-
click here
Translate to English
Translate to Hindi
Show AI Response

9129 views
1

Jan 21 2019 (20:11)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 4203419-1               Past Edits
BSB gaya tha last week kisi kaam se, Ald ke liye wapasi me koi train nahi mili khali to DDU aa gaya aur BGP-LTT mil gayee shaam ko lagbhag 6:30 baje. Good train. As there was many seats Vacant, I sat in SL on express SF general ticket till ACOI.
Baithe Baithe dost ke saath ye discussion chal pada ki ek taraf BGP-Kiul aur dusri taraf MKP-KTE elec naa hone ke karan ek train faltu me 1100-1200 km (BGP-ET) diesel ragad rahi hai. Fir one passenger from your region said that Kiul staff laziness for timely Loco change has forced many delhi bound trains from your region to run on d-loco wasting diesel till DDU and south/mumbai bound trains like this is
...
more...
wasting diesel because three loco changes (at Kiul, then DDU/ACOI, then again at KTE/JBP/ET) will waste a lot of time which railway will not allow even if staff at Kiul, ACOI etc agrees.
What you people think?? After Kiul-BGP elec completes in March BP Mail, V Shila will get loco from BGP only, but what will happen to trains like this viz bgp-ltt, bgp-surat, ghy-ltt, sanghmitra etc???
(Because MKP-KTE elec will take atleast 6-7 months to complete in best scenario)

Translate to English
Translate to Hindi
Show AI Response

8668 views
1

Jan 21 2019 (21:58)
Railadventures~
Railadventures~   2770 blog posts
Re# 4203419-2              
I have been also thinking about this senario from so long mkp to kte is delay due to corruption hole it finishes all up Bihar Mumbai bound train goes through this line and are made to end to end diseal due to remains this part last year they finished lot area from Itarsi to Jabalpur then Katni hope by end of this year while section gets operations here at Bhagalpur substation work not started yet may be in march till JMP elcos will start then after election till Bhagalpur as substation key now else alll work completed, wiring on station left. 2n overbridge out of 3 will be dismantled as low in height
Translate to English
Translate to Hindi
Show AI Response

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy