As you said, both 12763 and 12727 arrived at the same time, good. 12727 needs minimum 15 minutes for loco reversal etc whereas 12763 can be started in 5 to 10 minutes just after crew change. Why to delay 12763 unnecessarily more because of a loco reversal of some other train?