I got very excited about the proposed extension, since I have been wanting to see a classy Mumbai-Rajkot train for over 20 years. And I was already imagining a royal train going non-stop from ADI to RJT with a run under 4 hours. But the proposed schedule is HUGE disappointment. Bohut dukh hua :-( :-( :-( :-( :-( Almost 80% of the trains have faster schedules between ADI and RJT. What is the reason for such a pathetic run? After all, this is the Duronto and deserves the fastest run, correct? Also, why Surendranagar? They should have followed the policy of MINIMAL halts for Duronto and kept a non-stop ADI-RJT run. Very, very angry and disappointed. Kis gadhe ne yeh schedule nikala?